All notes

Studio

·

·

2 min read

How I quote a project

One fixed price, written down before we start. Why I stopped billing by the hour, and what goes into the number.

One fixed price, written down before we start. Why I stopped billing by the hour, and what goes into the number.

Ida Lund

Ida Lund

Brand & product designer

For my first two years as an independent designer I billed by the hour. It was fair on paper and miserable in practice. Clients worried about every meeting, and I was penalised for getting faster.

One price, agreed up front

Now every project gets a fixed price, written down before we start. The quote covers a clear scope, a timeline with dates and one number. If the scope changes, we talk about it and I send a new quote. That happens less often than you might think.

What goes into the number

Four things, all of them written into the quote.

  • The time I expect it to take, estimated honestly and then rounded up.

  • Rounds of feedback, usually two per stage.

  • Production: print specs, press checks, handover files and a small library.

  • Risk. A new market or a tight deadline costs more, and I say so.

What I send

The quote is two pages. Page one restates the problem in the client’s own words, so we both know what we are solving. Page two lists the stages, what each one delivers, the dates and the price. Payment is split in three: at the start, at the halfway review and at handover.

It is not the cleverest pricing model, but clients can plan around it, and I can concentrate on the work instead of the timesheet.

Newsletter

One email when there’s a new note.

No more than once a month. Unsubscribe with one click.

Create a free website with Framer, the website builder loved by startups, designers and agencies.